Your next building,
made in a plant.

Industrial sheds, warehouses, site utilities and buildings. Designed, cast and erected by one team.

Scroll to build

Illustrative renders · Notes
Prahant group2008Building since
Prahant group15+Projects completed
Prahant group5 lakh+Sq ft built
Prahant Precast2027Precast plant delivering from

01 · The problem

Building on site is slow, because every step waits.

A conventional factory is built one step at a time. No step can start until the one before it is finished.

A factory built the conventional way: columns in timber shuttering, scaffolding, brickwork and a muddy site
Illustrative render
  1. Step 1Footings
  2. Step 2Frame
  3. Step 3Brickwork
  4. Step 4Plaster
  5. Step 5Paint
  6. Only thenHandover

Four things delay every step

  • ShutteringTall columns and long beams need large formwork, built and removed for every pour.
  • CuringConcrete poured on site must harden before work continues.
  • LabourEach step needs a large gang. If they are short, work stops.
  • WeatherRain stops site work.

The result: one delay pushes every step after it. Your handover moves, and so does your first day of production.

02 · The shift

Make it in a plant. Assemble it on site.

Columns, beams and wall panels are cast and cured in our plant while your site is prepared. They arrive finished and are erected by crane.

Inside a precast plant: a wall panel freshly cast on a steel bed under a gantry crane
1

Cast in the plant

Every element is made and cured under cover, while your site is being prepared.

A trailer carrying stacked precast wall panels on a highway
2

Delivered finished

Elements reach your plot ready to erect. Nothing is cast or cured on site.

Aerial view of a precast factory frame half erected by two cranes
3

Erected by crane

A crane and a small crew assemble the building, element by element.

Illustrative renders.

03 · What changes for you

Five differences you can measure.

Why precast, in detail
3–5× fasterStructure and walls, on site
50% less labourOn site, against conventional
50–65% smaller heat swingAt the inner face of a 150 mm concrete wall, 4–6 hours later
No fire coatingConcrete does not burn
Zero finishing tradesFair-faced from the mould
Illustrative renders

Indicative figures. How we state figures

04 · What we deliver

Four systems. One complete site.

Order one, or all four. Each is designed, cast and erected by us.

05 · Fit

When precast is not the right choice.

We would rather tell you now than after a site visit.

  • Small, one-off buildings

    Below a certain size, moulds, transport and a crane cost more than they save.

  • Highly irregular shapes

    Precast pays when elements repeat. Curves and one-off geometry are better cast on site.

  • Sites a crane cannot reach

    Erection needs access for trailers and room for a crane to work.

06 · Who we are

Builders first. Since 2008.

Prahant has built in Gujarat since 2008. Prahant Precast is the group's precast company, with its own plant and European machinery. The projects below are the group's work.

Shreeji Avenue, a completed Prahant group project
Shreeji AvenueVadodara
Shreeji Darshan, a completed Prahant group project
Shreeji DarshanNarsanda
PS Bungalow, a completed Prahant group project
PS BungalowAnand

07 · Get a quote

Tell us what you are building.

Send your plot size, shed area and planned start. We reply with the right system, a programme and a budget price.

Phone / WhatsApp
+91 81415 57770
Office
204, Maruti Saday, 80 Feet Road, Anand, Gujarat 388001
Systems needed

Have drawings? Send them after this form, on WhatsApp or email.